The third project in a successful partnership with Energiegenossenschaft Vogelsberg eG will be connected to the grid this month in Ulrichstein (Hesse). One part of the plant with 749.39 kW and 1647 modules is remunerated per the EEG, the other with 1093.50 kWp and 2430 modules is a tender plant. In total, both plant sections have a capacity of 1.84 MW. As in all projects already realised with the EG Vogelsberg, sheep take care of the greenery.