Eppingen substation

Completion
2025
Location
Baden-Württemberg
Completion
2025
Location
Baden-Württemberg

The Eppingen substation (Heilbronn district) officially went into operation in October 2025, enabling the connection of the neighbouring Gemmingen solar park with a capacity of 60 MW.

The symbolic ground-breaking ceremonies in April 2025 – both at the substation construction site and at the solar park – marked the start of this significant construction project. Thanks to the generous dimensions of the substation, the connection of another solar park in Eppingen with a capacity of around 30 MW is already being planned.

The Eppingen substation (Heilbronn district) officially went into operation in October 2025, enabling the connection of the neighbouring Gemmingen solar park with a capacity of 60 MW.

The symbolic ground-breaking ceremonies in April 2025 – both at the substation construction site and at the solar park – marked the start of this significant construction project. Thanks to the generous dimensions of the substation, the connection of another solar park in Eppingen with a capacity of around 30 MW is already being planned.