Photovoltaic system in Ehringshausen

Output
3.2 MW
Completion
2022
Location
Hesse
Output
3.2 MW
Completion
2022
Location
Hesse

Ehringshausen - Thanks to excellent technical project management, a ground-mounted system with a total output of 3,240 kW was implemented in May 2022. This is already the fifth successful project with Energiegenossenschaft Vogelsberg eG. The 1.25 km long route to the grid connection point will be completed in mid-June and the plant will then be put into operation.

Ehringshausen - Thanks to excellent technical project management, a ground-mounted system with a total output of 3,240 kW was implemented in May 2022. This is already the fifth successful project with Energiegenossenschaft Vogelsberg eG. The 1.25 km long route to the grid connection point will be completed in mid-June and the plant will then be put into operation.