Construction work on the ground-mounted photovoltaic system began at the end of September.
The solar park was built on an area of around 14 hectares in Ottenbüttel, Schleswig-Holstein.
The plant has an output of 10 megawatts peak with over 16,500 modules.
Ottenbüttel aims to contribute to the energy transition by using renewable energies.
The plant was successfully commissioned in March 2024.