DC-side completion of the PV plant in Neustadt

Output
1,5 MW
Completion
2022
Location
Hesse
Output
1,5 MW
Completion
2022
Location
Hesse

After already three successful projects in cooperation with the Energiegenossenschaft Vogelsberg eG, another photovoltaic system has now been realized in Neustadt (Hesse). This involves two parts with 750 kW each, divided into a plant according to the tender model and an EEG plant. Despite the bad weather conditions, during the work, the DC-side commissioning on 18.02.2022 could be completed in just under 3 weeks for about 1.5 MW without any problems.

After already three successful projects in cooperation with the Energiegenossenschaft Vogelsberg eG, another photovoltaic system has now been realized in Neustadt (Hesse). This involves two parts with 750 kW each, divided into a plant according to the tender model and an EEG plant. Despite the bad weather conditions, during the work, the DC-side commissioning on 18.02.2022 could be completed in just under 3 weeks for about 1.5 MW without any problems.